Project overview
Residential driveway extension and site preparation in New Port Richey. The recorded scope included palm-tree removal, water-line capping, recycled asphalt millings, and a vegetation-control spray treatment. Photos show the finished curved driveway and its connection to the existing access and parking areas.
Documented work performed
- Driveway site preparation
- Recycled asphalt millings installation
- Vegetation-control treatment
